User Manual - Page 697

For AUTOCAD 2011.

Loading ...
Loading ...
Loading ...
The synchronization dialog is displayed with two lists. The top
list shows styles and display settings that are either older versions
of standard styles or display settings, or nonstandard (newer)
versions. The bottom list shows a list of not standardized styles
and display settings. For a definition of terms, see Project
Standards Terminology on page 585.
3 To synchronize a style or display setting that is either an older
version or a nonstandard (newer) version, select Update from
Standards from the Action drop-down list.
4 To skip over a style or display setting that is either an older version
or a nonstandard (newer) version, select Do not Update from the
Action drop-down list.
In this case, the nonstandard version remains in the project
drawing for now, and is not updated with the standard. The next
time the drawing is synchronized, the style or display setting will
be listed again as inconsistent with the standard.
5 To ignore a style or display setting that is inconsistent with the
standard, select Ignore from the Action drop-down list.
In this case, the inconsistent object will not be listed again in
future synchronizations, except if you select Show objects set to
ignore during project standards synchronization, or remove the
Ignore flag from the style or display setting in Style Manager or
Display Manager, as described in Excluding Styles and Display
Settings from Synchronization on page 651.
WARNING You should use the Ignore option only in clearly defined
exception cases where you are sure that a style or display setting does
not need to conform to the project standards.
6 To skip over a not standardized style or display setting, select Skip
from the Action drop-down list.
The next time the drawing is synchronized, the style or display
setting will be listed again as not standardized.
NOTE You cannot promote not standardized styles and display
settings to standard ones here. To do this, you need to add the not
standardized style to the project standards, as described in Adding
Standard Objects from a Project Drawing to a Project Standards
Drawing on page 670.
Synchronizing a Project with AEC Standards | 641
Loading ...
Loading ...
Loading ...