User Manual - Page 521

For AUTOCAD 2011.

Loading ...
Loading ...
Loading ...
Type VISRETAIN at the command line, and verify
that this variable is set to 1 before saving and
-----Specify settings for the view
closing the view drawing. The setting is saved in
the drawing template on page 187 and should be
verified before you create a sheet.
Type VPLAYEROVERRIDESMODE at the command
line, and verify that this variable on page 715 for
AutoCAD Architecture is set to 1.
-----
Specify settings for AutoCAD
Architecture
Create on page 470 a sheet, and drag the view on
page 451 onto the sheet or create on page 454 and
-----Add the view to a sheet
place a model space view on page 457 on the
sheet.
Linking a Legacy View Drawing to a Sheet View
In order to synchronize the view drawing layers with the sheet view layers,
the sheet view and view drawing must be linked. In legacy projects created
with a previous version of the software, where a view drawing without model
space views was placed on a sheet, this information does not exist and must
be added by linking the sheet view to the view drawing.
When this happens, the sheet view icon on the sheet set tree displays a warning
icon ( ). The sheet view must be linked to the view drawing to establish
the link and allow synchronization.
NOTE In other cases where the link between a sheet view and its associated view
drawing is broken, no warning icon will be displayed. In these cases, the sheet
view must be recreated in the sheet by dragging the model space view or view
drawing onto the sheet again. This creates a new sheet view with the correct
connection. The connection between sheet view and view drawing or model space
view can be broken by: renaming of the view drawing, renaming of the model
space view, copying and pasting a sheet viewport, or creating a viewport by using
the MVIEW command.
Synchronizing View Drawing Layers with Sheet View Layers | 465
Loading ...
Loading ...
Loading ...