Hitachi ZAXIS 260FLC-FE-6N

User Manual - Page 341

For ZAXIS 260FLC-FE-6N.

PDF File Manual, 383 pages, Download pdf file

Loading ...
Loading ...
Loading ...
Miscellaneous—Storage
TX,MONTHLY,STORE,PROC -19-01MAR21-1/1
Monthly Storage Procedure
NOTE: The following procedure is used monthly
when the engine has not been prepared for
long-term storage. See Preparing Engine for
Long-Term Storage in this section.
CAUTION: Prevent possible injury or death
from asphyxiation. Engine exhaust fumes
can cause sickness or death. ONLY start
engine in a well-ventilated area.
1. Clear area around machine to allow for movement
2. Charge and install batteries.
3. Turn battery disconnect switch to the ON position. See
Battery Disconnect Switch. (Section 2-2.)
4. Remove LPS Rust Inhibitor from cylinder rods with
a cleaning solvent.
5. For machines with tires, check condition of tires and tire
pressure. For machines with tracks, check condition
of tracks and track sag. For non-sealed and lubricated
track chains, apply oil to the pin-to-bushing joints.
6. Inspect engine compartment and remove any foreign
material.
7. Check belts.
IMPORTANT: Prevent possible engine damage.
During cold temperatures, check uidity of
engine oil on dipstick. If the oil appears waxy
and/or jelly like rather than liquid, DO NOT
attempt to start engine. Use external heat source
to warm the crankcase until oil appears uid.
8. Check all uid levels. If low, check for leaks and add
oil as required.
9. Check condition of all hoses and connections.
CAUTION: Prevent possible injury from
unexpected machine movement. Clear the area
of all persons before operating the machine.
NOTE: If the batteries are kept disconnected for more
than 1 month, resetting of the monitor may be
required. Contact an authorized John Deere dealer.
Start engine and run until machine reaches normal
operating temperature.
If engine does not start or runs poorly after starting,
change fuel lters. Bleed fuel system.
10. Operate all controls, levers, seat adjustments, etc.
If equipped, operate air conditioning system for 2
minutes.
11. Run machine back and forth several times.
12. Park the machine with cylinder rods retracted, if
possible. Shut off engine.
13. Place a DO NOT OPERATE tag in operator’s station
14. Check condition of all hoses and connections.
15. Drain water and sediment from fuel tank.
IMPORTANT: LPS Rust Inhibitor can destroy
painted nish. DO NOT spray LPS Rust
Inhibitor on painted areas.
16. Apply LPS 3Rust Inhibitor to exposed cylinder rod
areas.
17. Lock all covers and doors if equipped
4-4-2
112321
PN=339
Loading ...
Loading ...
Loading ...