Hitachi ZAXIS 260FLC-FE-6N

User Manual - Page 217

For ZAXIS 260FLC-FE-6N.

PDF File Manual, 383 pages, Download pdf file

Loading ...
Loading ...
Loading ...
Maintenance—As Required
JL41294,0000368 -19-26AUG21-1/1
Replace Case Drain Filter—If Equipped
1. Prepare machine for maintenance. See Prepare
Machine for Maintenance. (Section 3-2.)
2. Depressurize the hydraulic system. See Drain and
Rell Hydraulic Tank Oil and Clean Suction Screen.
(Section 3-15.)
3. Remove cap screws (1) and cover (2).
4. Turn lter bowl (3) counterclockwise, and remove from
head assembly (4).
5. Remove lter element from inside of bowl, and inspect
the surface for contamination.
6. Discard lter element.
7. Inspect lter head assembly for possible damage.
Replace as necessary.
8. Lubricate O-ring seal, and install new lter element.
9. Lightly lubricate the threads of the lter bowl and
O-ring, and screw the lter bowl into the head
assembly.
10. Install cover and cap screws.
11. Bleed air from hydraulic system. See Bleed Hydraulic
System. (Section 4-1.)
1— Cap Screw (4 used)
2— Cover
3— Filter Bowl
4— Head Assembly
TX1316153A —UN—26AUG21
Processor Boom Hydraulic Lines
TX1316155A —UN—26AUG21
High-Pressure Supply Filter and Case Drain Filter
3-3-13
112321
PN=215
Loading ...
Loading ...
Loading ...