User Manual - Page 160

For SDS1202X-E.

Loading ...
Loading ...
Loading ...
SDS1000X-E User Manual
135
WWW.SIGLENT.COM
Figure 87 Time Measurements
1.
Period:
Period for every cycle in waveform at the 50% level, and positive slope.
2.
Frequency:
Frequency for every cycle in waveform at the 50% level ,and positive
slope
3.
+ Width:
Width measured at 50% level and positive slope.
-
Width:
Width measured at 50% level and negative slope.
4.
Rise Time:
Duration of rising edge from 10-90%.
5.
Fall Time:
Duration of falling edge from 90-10%.
6.
BWid
: Time from the first rising edge to the last falling edge, or the first falling edge to
the last rising edge at the 50% crossing.
7.
+ Duty:
Ratio of positive width to period.
-
Duty:
Ratio of negative width to period.
8.
Delay
Time from the trigger to the first transition at the 50% crossing.
9.
T@L
Time from trigger of each transition at a specific level and slope, include:
Current, Max, Min, Mean, Std-dev.
Delay Measurements
Delay measurements measure the time different between arbitrary two channels,
including 10 kinds of delay measurements.
1.
Phase:
Calculate the phase difference between two edges.
2.
FRFR:
Time between the first rising edges of the two channels.
3.
FRFF:
Time from the first rising edge of channel A to the first falling edge of channel
B.
4.
FFFR:
Time from the first falling edge of channel A to the first rising edge of channel
B.
5.
FFFF:
Time from the first falling edge of channel A to the first falling edge of channel
B.
6.
FRLR:
Time from the first rising edge of channel A to the last rising edge of channel
B.
Loading ...
Loading ...
Loading ...