Kawasaki 2013 Z1000

User Manual - Page 701

For 2013 Z1000.

PDF File Manual, 745 pages, Read Online | Download pdf file

2013 Z1000 photo
Loading ...
Loading ...
Loading ...
APPENDIX 17-27
Cable, Wire, and Hose Routing
1. Air Cleaner Housing
2. Air Switching Valve Hose
3. Air Switching Valve
4. Tighten the clamp bolt from left side.
5. Tighten the clamp bolt from right side.
6. Intake Air Temperature Sensor
7. Install the clamp so that knob of the clamp faces rear side of the frame as shown.
8. Breather Hose
9. Clamp
10. Clamps
11. Air Cleaner Drain Hose
12. Catch Tank
13. White Paint Mark
14. Right Side of the Frame
15. Left Side of the Frame
16. Viewed from A
Loading ...
Loading ...
Loading ...