Kawasaki 2013 Z1000

User Manual - Page 687

For 2013 Z1000.

PDF File Manual, 745 pages, Read Online | Download pdf file

2013 Z1000 photo
Loading ...
Loading ...
Loading ...
APPENDIX 17-13
Cable, Wire, and Hose Routing
1. Insert the clamps of the main harness to the ribs of the inside of the frame.
2. Hold the rear brake light switch connector with the clamp.
3. Run the main harness under the pin.
4. Hold the fuel pump lead (main harness side) with the clamp and insert it to the battery case.
5. Starter Motor Cable
6. Run the starter motor cable to the upside of the main harness, between the starter relay and
battery, and to the left side of the battery positive (+) cable.
7. Hold the regulator/rectifier lead to the battery case with the clamp.
8. Front
9. Run the main harness to the inside at front of battery case.
10. Run the exhaust butterfly valve actuator leads between the fuse box and the battery.
11. Run the fuel pump lead to the upside of the exhaust butterfly valve cables, to the outside of the
fuse box, and to under the fuel tank bracket.
12. Exhaust Butterfly Valve Actuator Leads
13. Exhaust Butterfly Valve Cables
14. Run the main harness to the outside at rear of battery case.
Loading ...
Loading ...
Loading ...