Kawasaki 2013 Z1000

User Manual - Page 241

For 2013 Z1000.

PDF File Manual, 745 pages, Read Online | Download pdf file

2013 Z1000 photo
Loading ...
Loading ...
Loading ...
COOLING SYSTEM 4-11
Water Pump
Be sure to install the dowel pins [A].
Install:
Water Pump Housing [A]
Water Pump Impeller [B]
Tighten:
Torque - Water Pump Impeller Bolt [C]: 9.8 N·m (1.0 kgf·m,
87 in·lb)
Be sure to install the dowel pins [D].
Replace the O-ring [A] with a new one, and install it.
Install the water pump cover [A] and the clamp.
Touch the clamp to the boss [B] of the water pump cover.
Tighten:
Torque - Water Pump Cover Bolts [C]: 11 N·m (1.1 kgf·m, 97
in·lb)
Replace the O-ring [D] with new ones.
Install the water pipes [A] to the water pump cover.
Apply a non-parmanent locking agent to the threads of
the water pipe bolts [B], and tighten them.
Torque - Water Pipe Bolts: 12 N·m (1.2 kgf·m, 106 in·lb)
Install the water hose [C].
Tighten:
Torque - Water Hose Clamp Screw [D]: 2.9 N·m (0.30 kgf·m,
26 in·lb)
Connect the neutral switch connector [E].
Loading ...
Loading ...
Loading ...