Binder VDL 23 Vacuum drying

User Manual - Page 84

For VDL 23. Also, The document are for others Binder models: VDL 23-UL, VDL 56, VDL 56-UL, VDL 115, VDL 115-UL

PDF File Manual, 197 pages, Read Online | Download pdf file

VDL 23 photo
Loading ...
Loading ...
Loading ...
VDL (E3.1) 10/2020 Page 84/196
9.2 Overview of the drying process
Required measures for operation with solvent-containing substances, which may be able to form an explo-
sive mixture with air:
Starting situation
The vacuum drying oven and additional equipment have been set up and installed in ac-
cordance with the instructions in this manual, the instructions of the operator and the rele-
vant regulations. Equipotential bonding according to the grounding concept is ensured
The auto-ignition temperature of the solvent has been determined from its safety specifica-
tions
In the case of solvent mixtures, use the lowest auto-ignition temperature.
All users have been trained and are familiar with the safety plan and the required measures.
The vacuum source is connected and ready for operation
The technical ventilation is activated.
The compressed air supply is connected and ready for operation. The monitoring of the
defined inlet pressure (2 bar) is active.
Sweeping the area for electrical equipment, the preheating chamber, and controller housing
(triangular instrument box)
Turn the pressure regulator on the chamber rear until the clamping ring touches the lower
stop (turn clockwise).
Open the sweeping plug on the chamber rear and the USB cover on the controller housing.
Sweep the electrical installation room, the preheating chamber and the controller housing
with compressed air for the specified duration (chap. 9.3.2) at maximum overpressure
Close the sweeping plug on the chamber rear and the USB cover on the controller housing
Now the pressure regulator can be turned back (counter-clockwise rotation) until the clamp-
ing ring touches the upper stop. (only tighten to the stop by hand)
Check on the manometer that an overpressure of at least 25 Pa (recommendation: >40 Pa)
has been reached
Loading and starting the drying process
Make sure that the technical ventilation is activated
Make sure that equipotential bonding has been established according to the grounding con-
cept
Make sure that the sweeping times of the electrical installation room, preheating chamber,
and controller housing (triangular instrument box) have been observed
Make sure that the compressed air supply for sweeping the electrical installation area, pre-
heating chamber, and controller housing is still open. Check the excess pressure of at least
25 Pa on the manometer (recommendation: >40 Pa).
In case of Standby mode turn on the vacuum drying oven on the controller
Set the desired temperature setpoint on the controller.
Set the safety controller to a suitable value.
Recommended setting: safety controller mode: Limit, safety controller value approx. 5 °C
above the temperature set-point
Loading ...
Loading ...
Loading ...