Binder VDL 23 Vacuum drying

User Manual - Page 176

For VDL 23. Also, The document are for others Binder models: VDL 23-UL, VDL 56, VDL 56-UL, VDL 115, VDL 115-UL

PDF File Manual, 197 pages, Read Online | Download pdf file

VDL 23 photo
Loading ...
Loading ...
Loading ...
VDL (E3.1) 10/2020 Page 176/196
Prior to handing the chamber over to a recycling company, it is the user’s responsibility that it
is free from toxic, infectious or radioactive substances.
Prior to disposal, clean all introduced or residual toxic substances from the chamber.
Prior to disposal, disinfect the chamber from all sources of infection. Be aware that sources
of infection may also be located outside the inner chamber.
If you cannot safely remove all sources of infection and toxic substances from the chamber,
dispose of it as “special” waste according to national law.
Fill out the contamination clearance certificate (chap. 32) and enclose it with the chamber.
WARNING
Danger of intoxication and infection through contamination of the chamber with
toxic, infectious or radioactive substances.
Damages to health.
NEVER take a chamber contaminated with toxic substances or sources of infection for
recycling according to Directive 2012/19/EU.
Prior to disposal, remove all toxic substances and sources of infection from the cham-
ber.
A chamber from which all toxic substances or sources of infection cannot be safely re-
moved must be considered as “special” waste according to national law. Dispose of it
accordingly.
27.5 Disposal of the chamber in non-member states of the EU
NOTICE
Danger of violation against existing law if not disposed of properly.
Alteration of the environment.
For final decommissioning and disposal of the vacuum drying oven, please contact
BINDER Service.
Follow the statutory regulations for appropriate, environmentally friendly disposal.
The main board of the vacuum drying oven in the controller housing (triangular instrument box) includes a
lithium cell. Please dispose of it according to national regulations.
28. Technical description
28.1 Factory calibration and adjustment
This chamber was calibrated and adjusted in the factory. Calibration and adjustment were performed using
standardized test instructions, according to the QM DIN EN ISO 9001 system applied by BINDER (certified
since December 1996 by TÜV CERT). All test equipment used is subject to the administration of measure-
ment and test equipment that is also a constituent part of the BINDER QM DIN EN ISO 9001 systems. They
are controlled and calibrated to a DKD-Standard at regular intervals.
Factory adjustment was done in the center of the usable volume and under vacuum conditions. The sensor
is fixed in the middle of the expansion rack in a way ensuring good thermal conductivity (heat conduction).
Measuring is performed in equilibrated state.
Loading ...
Loading ...
Loading ...