Binder VDL 23 Vacuum drying

User Manual - Page 71

For VDL 23. Also, The document are for others Binder models: VDL 23-UL, VDL 56, VDL 56-UL, VDL 115, VDL 115-UL

PDF File Manual, 197 pages, Read Online | Download pdf file

VDL 23 photo
Loading ...
Loading ...
Loading ...
VDL (E3.1) 10/2020 Page 71/196
7.3 Objective of testing
Determine the suitability and functionality of safety-related measures. When testing the explosion safety of
the system, evaluate the explosion protection plan and compare the target state derived from it with the
actual state of the system (according to available test records):
Assess the completeness and plausibility of safety-related documents (such as the explosion protection
document, installation plans, zone plans, safety-related figures)
Determine whether the system has been set up in accordance with national regulation (GefStoffV for
Germany) and is safe for use with regard to explosion protection
Technical measures are suitable and functional for explosion protection,
Technical organizational measures necessary for explosion protection are suitable
The deadline for the next recurring test was correctly set in accordance with national regulations (in
accordance with § 3 Para. 6 BetrSichV for Germany).
Performing tests
The tests can be divided into the verification of the documentation and a technical examination.
7.4 Testing before initial commissioning
Proceed according to country-specific regulations (for Germany in particular: TRBS 1201 Part
1; BetrSichV).
Before the initial commissioning of the Ex system, perform the explosion safety test. It serves to determine
the explosion safety of the system, including the work equipment and the working environment.
The test represents a comprehensive consideration of the explosion safety of the Ex system with regard to
the protection of employees and other persons in the hazard area, including all functional units relevant to
explosion protection and their interactions. The test of explosion safety is based on the explosion protection
plan from the employer in accordance with the specifications in the explosion protection document and its
implementation in the Ex system. Equivalent test results according to other legal regulations can be con-
sidered. It is also permissible to refer to tests that have already been carried out.
7.4.1 Scope of the test
7.4.1.1 Testing the plausibility of the explosion protection plan and measures
Verification of the traceability and plausibility of the explosion protection plan given in the explosion protec-
tion document and the measures derived from this in consideration of underlying constraints.
The test does not apply to systems for which this test has already been carried out in the course of a permit
or approval process.
7.4.1.2 Verifying the implementation of measures
Verification of the measures described in the explosion protection document with regard to their implemen-
tation includes a holistic examination of the technical and organizational measures in accordance with the
specifications of the explosion protection document. Typical test aspects (examples):
Loading ...
Loading ...
Loading ...