Binder VDL 23 Vacuum drying

User Manual - Page 14

For VDL 23. Also, The document are for others Binder models: VDL 23-UL, VDL 56, VDL 56-UL, VDL 115, VDL 115-UL

PDF File Manual, 197 pages, Read Online | Download pdf file

VDL 23 photo
Loading ...
Loading ...
Loading ...
VDL (E3.1) 10/2020 Page 14/196
Symbol on the type plate
Information
Electrical and electronic equipment manufactured / placed on
the market in the EU after 13 August 2005 and to be dis-
posed of in a separate collection according to Directive
2012/19/EU on waste electrical and electronic equipment
(WEEE).
The chamber is certified according to Customs Union Tech-
nical Regulation (CU TR) for the Eurasian Economic Union
(Russia, Belarus, Armenia, Kazakhstan Kyrgyzstan).
1.7 Safety instructions on installing and operating the vacuum drying oven
With regard to operating the vacuum drying oven VDL and to the installation location, please observe the
relevant national regulations (for Germany in particular: DGUV guidelines 213-850 on safe working in la-
boratories, issued by the employers’ liability insurance association; Industrial Safety Regulation (Be-
trSichV); Ordinance on Hazardous Substances (GefStoffV); Technical Regulations on Industrial Safety and
Health (TRBS 1201 Part 1).
The central element of the Industrial Safety Regulation is the risk assessment performed by competent
personnel which enables an employer to evaluate risks that may arise before using work equipment and to
derive necessary and suitable tests and measures.
Explosion protection plan
The explosion protection plan to be created by the operator represents the entirety of the technical and
organizational measures for explosion protection determined and specified on the basis of the risk assess-
ment. In accordance with ATEX Operational Directive 1999/92/EC, these measures serve
to prevent the formation of or to limit explosive atmospheres or to limit hazardous explosive mixtures
to avoid the combustion of explosive atmospheres
to limit the spread of an explosion and to minimize its effects on personnel in order to ensure the health
and safety of employees
The explosion protection document serves to document the results of the risk assessment in accordance
with § 6 Para. 9 GefStoffV (for Germany).
BINDER GmbH is only responsible for the safety features of the chamber provided skilled electricians or
qualified personnel authorized by BINDER perform all maintenance and repair, and if components relating
to chamber safety are replaced in the event of failure with original spare parts.
To operate the chamber, use only original BINDER accessories or accessories from third-party suppliers
authorized by BINDER. The user is responsible for any risk caused by using unauthorized accessories.
1.7.1 Safety instructions on installation and ambient conditions of the chamber
Familiarize yourself with the local conditions, particularly allocation to a defined potentially explosive area
(zones) and the according technical safety requirements. During installation, commissioning and operation
of the vacuum drying oven and the connected vacuum pump or in-house vacuum supply, always follow the
requirements defined by the classification of the installation site.
Loading ...
Loading ...
Loading ...