Binder VDL 23 Vacuum drying

User Manual - Page 65

For VDL 23. Also, The document are for others Binder models: VDL 23-UL, VDL 56, VDL 56-UL, VDL 115, VDL 115-UL

PDF File Manual, 197 pages, Read Online | Download pdf file

VDL 23 photo
Loading ...
Loading ...
Loading ...
VDL (E3.1) 10/2020 Page 65/196
NOTICE
Overpressure in the inner chamber.
Perturbation of the load.
DO NOT change the setting of the atmospheric pressure.
6.7 Mounting the tilt protection holders
For chambers placed on the optional pump module it is recommended to install the supplied tilt protection.
Scope of delivery of tilt protection kit (Art.no. 8009-0870):
2 screws
2 tilt protection holders
Preparing the tilt protection holders
Depending on the desired wall distance, you can bend the tilt protection holders accordingly.
Figure 17: Variable length of the tilt protection holder depending on the bend
Installation on the chamber
Plug the two tilt protection holders each with the tab into the mounting holes and push them upward
over the rear panel. The screw holes in the rear wall and in the tilt protection holders must align.
Fix the tilt protection holders each with one of the supplied screws on the chamber rear wall.
Wall mounting
Then fix both tilt protection holders on the wall, each with 2 screws Ø 6mm suitable for the wall (B)
Loading ...
Loading ...
Loading ...