Kawasaki 2015 Z1000 Kwasaki

User Manual - Page 723

For 2015 Z1000.

PDF File Manual, 734 pages, Read Online | Download pdf file

2015 Z1000 photo
Loading ...
Loading ...
Loading ...
APPENDIX 17-51
Cable, Wire, and Hose Routing
1. Run the purge hose above the engine subharness.
2. Run the purge hose above the stick coil #3 lead.
3. Run the purge hose between the air switching valve hose and stick coil #4 lead.
4. Run the purge hose above the radiator overflow hose.
5. Run the purge hose between the main throttle sensor and subthrottle sensor.
6. Run the purge hose under the rear wheel rotation sensor lead, crankshaft sensor lead, rear
brake light switch lead and alternator lead.
7. Run the purge hose above the brake hoses (ABS equipped models) and main harness.
8. Clamp (Hold the purge hose. Install it to the frame.)
9. Run the purge hose to the outside of the starter motor lead and battery negative (–) cable.
10. Run the purge hose to the inside of the fuel tank drain hose.
Loading ...
Loading ...
Loading ...