Kawasaki 2015 Z1000 Kwasaki

User Manual - Page 691

For 2015 Z1000.

PDF File Manual, 734 pages, Read Online | Download pdf file

2015 Z1000 photo
Loading ...
Loading ...
Loading ...
APPENDIX 17-19
Cable, Wire, and Hose Routing
1. Install the clamp to the frame as shown.
2. Battery Positive (+) Cable
3. Starter Motor Cable
4. Battery Positive (+) Lead Connector
5. Run the battery positive (+) lead under the starter motor cable.
6. Fuel Tank Breather Hose (Other than CAL, SEA-B1 and TH Models)
7. Run the battery negative (–) cable to the outside of the fuel tank breather hose (other than CAL,
SEA-B1 and TH models).
8. Run the battery negative (–) cable under the fuel tank breather hose (other than CAL, SEA-B1
and TH models). Run it above the main harness.
Loading ...
Loading ...
Loading ...