User Manual - Page 89

For 2705138.

Loading ...
Loading ...
Loading ...
Part Number STH14 9/10 89
Operation
Blade Tower Brixing
NOTE: Each tower consists of two valves combined as
one with a mixer block, mixer tube and mixer. One
Pre-ME valve (CMBEGKER) and one Flomatic 424
Flow Control Base
Set water flow rate first:
1. Turn off syrup shut-off at post-mix (424) valve
block.
2. Use stop watch to time the dispense of soda
water only.
3. Dispense for 5 seconds.
4. Record volume in a volume cup or ratio cup.
5. Adjust the water flow rate as needed until
10 ounces (283.5 g) of water is measured in a
5 second (2 oz [56.7 g]/sec) dispense.
Set the syrup flow rate:
1. Adjust the ratio (brix) of water to syrup (4.75:1) or
12.3 to 12.7 brix)
2. Turn on syrup shut-off and turn off the water shut-
off.
3. Use a stop watch to time the dispense of syrup
only.
4. Dispense for 5 seconds.
5. Record volume in a volume cup or ratio cup.
6. Adjust syrup flow rate as needed until 2 ounces
(56.7 g) of syrup is measured in a 5 second
dispense.
7. Use a refractometer if possible to get final brix
ratio of 12.3 to 12.7. You will have to rely on
volume adjustment above for diet products.
STH14.book Page 89 Thursday, September 23, 2010 3:35 PM
Loading ...
Loading ...
Loading ...