Kawasaki 2014 Z1000 ABS

User Manual - Page 703

For 2014 Z1000 ABS.

PDF File Manual, 734 pages, Read Online | Download pdf file

2014 Z1000 ABS photo
Loading ...
Loading ...
Loading ...
APPENDIX 17-31
Cable, Wire, and Hose Routing
1. Rivet
2. Run the fuel tank breather hose (other than CAL, SEA-B1 and TH models) and battery negative
(–) cable into the hole of the heat insulation rubber plate.
3. Run the fuel tank drain hose into the hole of the heat insulation rubber plate.
4. Run the fuel hose into the hole of the heat insulation rubber plate.
5. Run the alternator lead in front of the heat insulation rubber plate.
6. Run the fuel pump lead above the heat insulation rubber plate.
7. Clamp (Hold the main harness and heat insulation rubber plate, and face the open side of the
clamp to the right side.)
Loading ...
Loading ...
Loading ...