Kawasaki 2014 Z1000 ABS

User Manual - Page 683

For 2014 Z1000 ABS.

PDF File Manual, 734 pages, Read Online | Download pdf file

2014 Z1000 ABS photo
Loading ...
Loading ...
Loading ...
APPENDIX 17-11
Cable, Wire, and Hose Routing
1. Run the main harness under the air switching valve.
2. Run the radiator fan motor lead under the frame.
3. Clamp (Hold the main harness (for throttle sensors) at the white tape.)
4. Viewed from A
5. Run the right switch housing lead under the frame. Run it to the outside of the radiator.
6. Run the main throttle sensor lead and subthrottle sensor lead under the air switching valve hose.
7. Clamps (Hold the fuel injector lead at the white tape position.)
8. Intake Air Temperature Sensor Lead Connector
9. Run the intake air temperature sensor lead under the crankshaft sensor lead and rear wheel
rotation sensor lead, and run it above the alternator lead.
10. Rear Wheel Rotation Sensor Lead
11. Crankshaft Sensor Lead
12. Alternator Lead
13. Frame Ground Terminal (The angle of ground lead is as shown.)
14. Fuel Hose
15. Breather Hose
16. Run the side stand switch lead in front of the frame. Run it under the fuel injector lead.
17. Run the fuel injector lead in front of the breather hose.
18. Take care not to pinch the engine subharness by the throttle body assy holder clamps.
19. Run the immobilizer antenna lead (equipped models) and ignition switch lead above the frame.
20. Run the main harness and throttle cables under the frame. Run them to the outside of the
radiator.
21. Run the immobilizer antenna lead (equipped models) and ignition switch lead around the ignition
switch.
Loading ...
Loading ...
Loading ...