Kawasaki 2014 Z1000 ABS

User Manual - Page 675

For 2014 Z1000 ABS.

PDF File Manual, 734 pages, Read Online | Download pdf file

2014 Z1000 ABS photo
Loading ...
Loading ...
Loading ...
APPENDIX 17-3
Cable, Wire, and Hose Routing
1. Run the right switch housing lead in back of the front brake hose and throttle cables. Run the
throttle cables in front of the front brake hose.
2. Harness Cover (Hold the right switch housing lead, throttle cables and front brake hose.)
3. Run the right switch housing lead and throttle cables in back of the guide on the headlight
bracket.
4. Clamp (Hold the throttle cables and front brake hose.)
5. Harness Cover (Hold the clutch cable and left switch housing lead.)
6. Clamp (Hold the meter lead and city light lead as shown.)
7. Run the throttle cables in front of the front brake hose, main harness, left switch housing lead
and city light lead.
8. Run the clutch cable in front of the throttle cables, front brake hose, main harness, left switch
housing lead and city light lead.
9. Meter Lead
10. Clamp (Hold the meter lead and city light lead as shown.)
11. City Light Lead
12. Front
13. Clamp (Hold the meter lead.)
14. Place the city light lead connector to the left side of the main harness.
15. Run the front brake light switch lead downward.
Loading ...
Loading ...
Loading ...