Loading ...
Loading ...
Loading ...
89
SIGNATURE RAILING
11. Place 2" x 4" (51 mm x
102 mm) on Signature
top rail.
12. Secure 2" x 4" (51
mm x 102 mm) to top
rail using Signature
Cocktail Bracket
(sold separately).
Ensure that there is a
bracket at each end
of the railing section,
then space brackets
approximately every
24" and attach with 4 screws provided.
NOTE: Predrilling before attachment is recommended.
13. Pre-drill a pilot hole
and toenail 2-1/2"
(6.4 cm) screw at each
end of 2" x 4" (5.1 cm x
10.2 cm) into post on
back side of rail (side
not facing decking).
14.
Attachment of Bottom Rail Bracket Covers
and Caps
See instructions on page 83.
1
1
11
1
12
2
13
HOW TO INSTALL SIGNATURE TRADITIONAL RAILING/CONTINUED
TREX SIGNATURE
HOW TO INSTALL FOOT BLOCKSHORIZONTAL RAILING
TREX SIGNATURE
Attachment of Foot Block (Required ONLY for All
Clear Span Applications Over 6
'
[1.83 m] )
1. To ensure correct location, place foot block under
center of bottom rail. Mark to provide placement
location of base.
2. Place base (smaller
side facing down) on
decking surface. Attach
base of foot block using
one screw at an angle
through base and into
decking.
NOTE: Pre-drilling is
recommended (1/8"
[0.32 cm] drill bit) for attachment of base.
3. After attached, use a
rubber mallet along
with scrap piece of
wood to tap foot block
until it locks into place.
1
2
1
2
1
3
Loading ...
Loading ...
Loading ...