Loading ...
Loading ...
Loading ...
50
HOW TO INSTALL DECKING
NOTE: Construction methods are always improving. Please refer to www.trex.com for the most up-to-date installation requirements.
» 3/4" (19 mm) FASCIA MUST BE USED, OR BOLTS MUST BE CUT DOWN.
» INSTALL POST TIGHTLY ON RIM JOIST FIRST – NUTS WILL BE INACCESSIBLE LATER.
» MUST USE TREX FASCIA MOUNT CORNER BRACKET KIT.
1.
Install post on rim joist and fully tighten using Simpson DTT2Z on top bolt.
2. Run 10” (254 mm) bolt through gap in existing Simpson DTT2Z and tighten into second DTT2Z.
3. Install bottom bolt.
NOTE: If a L70Z is in this location,
it must be removed so post mount
will fit properly.
Simpson
DTT2Z
1 Bolt 1/2" x 10" (13 mm x 254 mm),
Nut, and Washer
3 Bolts 1/2" x 6"
(13 mm x 152 mm),
Nuts, and Washers
Simpson
LUS28Z
Simpson
L70Z
Front Rim Joist
Side Joist
Trex Fascia Mount Corner
Bracket (Kit)
Trex Fascia
Mount Kit
(L Bracket)
3/4"
(19 mm)
Fascia
FASCIA MOUNT (OUTSIDE FRAME CORNER)
Loading ...
Loading ...
Loading ...