Loading ...
Loading ...
Loading ...
CB / CB-UL, CBF / CBF-UL (E7) 07/2021 Page 44/197
4.5.2.2 Installation and connection of the freshwater bag
Figure 16: Installation of the water supply via freshwater bag
(12) Pump head
(12a) Pump head cover
(12b) Tube retainer
(12c) Rotor
(13) Pump connector
Please proceed in the following order:
• Fill the freshwater bag. Observe water quality and temperature (chap. 4.5.1.3).
• Attach a tube connector part with a 5-7 mm nozzle to the freshwater bag ①
• Attach a tube connector part with a 3-5 mm nozzle to the silicone tube ②
• Connect both tube connector parts
• Turn the pump head (12) counterclockwise until it stops and remove it from the pump connector (13).
• Pull up the tongue of the tube retainer (12b) up to “Click” and remove it. Take the rotor (12c) out of the
pump head cover (12a). ③
• Lead the silicone tube along the rotor. Insert the rotor with the tube into the pump head cover. Keep the
hose tight and do not pinch it. ④
The end of the tube for connecting to the incubator should be about 6 cm long. With a total length of the
silicone tube of 32 cm, the tube end for connecting the freshwater bag has a length of approx. 18 cm
• Press the tube retainer (12b) into the pump head cover until it snaps into place
(13) (12c) (12)
(12b) (12a)
①
②
③
④
⑤
Loading ...
Loading ...
Loading ...