Loading ...
Loading ...
Loading ...
ELECTRICAL SYSTEM 16-69
Meter, Gauge, Indicator Unit
Meter Unit Removal
•
Remove:
Meter Cover Bolts [A] and Washers
Meter Cover [B]
•
Remove:
Bolts [A] and Washers
Collars
City Light (LED) [B]
•
Slide the dust cover [A], and disconnect the meter con-
nector.
•
Remove:
Meter Mounting Bolts [B] and Washers
Collars
•
Clear the projection [C] and remove the meter unit [D]
rearward.
Meter Unit Installation
•
Insert the projection [A] of the meter unit into the hole [B].
•
Install the collars.
•
Apply a non-permanent locking agent to the meter mount-
ing bolts, and tighten them together with the washers.
•
Connect the meter connector, and install the dust cover.
•
Install the city light (LED), and tighten its bolts together
with the collars and washers.
•
Check that the pads [A] are in place on the meter cove
[B].
Fit the pad to the line [C] on the cover.
Fit the pad to the corner line [D].
•
Install the meter cover, and tighten its bolts together with
the washers.
Torque - Meter Cover Bolts: 0.40 N·m (0.04 kgf·m, 3.5 in·lb)
Loading ...
Loading ...
Loading ...