Kawasaki 2015 Z1000 ABS

User Manual - Page 198

For 2015 Z1000 ABS.

PDF File Manual, 734 pages, Read Online | Download pdf file

2015 Z1000 ABS photo
Loading ...
Loading ...
Loading ...
3-110 FUEL SYSTEM (DFI)
ECU
Lift up the ECU [A] with rubber protector [B] to clear the
projections.
Remove the relay box [C] from the rubber protector.
Disconnect the ECU connectors [D].
Remove:
ECU (with Rubber Protector)
ECU Installation
Connect the ECU connectors [A].
Install:
ECU [B] (in Rubber Protector [C])
Insert the slits of the rubber protector to the projections
[D] of the rear fender.
Install the removed parts (see appropriate chapters).
ECU Power Supply Inspection
Visually inspect the ECU connectors.
If the connector is clogged with mud or dust, blow it off
with compressed air.
Remove the ECU (see ECU Removal).
Visually inspect the terminals [A] of the ECU and main
harness connectors.
If the terminals of the main harness connectors are dam-
aged, replace the main harness.
If the terminals of the ECU connectors are damaged, re-
place the ECU.
Turn the ignition switch off.
Disconnect the ECU connectors.
Gray Connector [A]
Set a tester [B] and check the following wiring for conti-
nuity.
ECU Grounding Inspection
Connections:
(I) BK/Y leads (ECU
terminal 39 or 65)
←→
Battery (–) Terminal
BK/BL lead (ECU
terminal 38)
(II) Engine Ground
←→
Battery (–) Terminal
Criteria:
Both: 0
If no continuity, check the connectors, the engine ground
lead, or main harness, and repair or replace them if nec-
essary.
Loading ...
Loading ...
Loading ...