User Manual - Page 275

For 2017 BMW 7 Series. Series: 7 Series

Loading ...
Loading ...
Loading ...
5. With the compressor switched off, insert
the plug into the power socket inside the
vehicle.
6. With standby state switched on or the en‐
gine running, switch on the compressor.
NOTE
The compressor can overheat during ex‐
tended operation. There is a risk of property
damage. Do not run the compressor for more
than 10 min.◀
Let the compressor run for max. 10 minutes to
fill the tire with sealant and achieve a tire infla‐
tion pressure of approx. 2.5 bar.
While the tire is being filled with sealant, the
tire inflation pressure may sporadically reach
approx. 5 bar. Do not switch off the compres‐
sor at this point.
Checking the tire inflation pressure
1.
Switch off the compressor.
2. Read the tire inflation pressure on the tire
pressure gage.
If a tire inflation pressure of 2 bar is not
reached:
1. Unscrew the filling hose of the sealant con‐
tainer from the wheel.
2. Press the red unlock button.
3. Remove the sealant container from the
compressor.
4. Drive 33 ft/10 m forward and back to dis‐
tribute the sealant in the tire.
5. Inflate the tire again using the compressor.
If a tire inflation pressure of 2 bar cannot be
reached, contact your dealer’s service cen‐
ter or another qualified service center or
repair shop.
Stowing the Mobility System
1.
Unscrew the filling hose of the sealant con‐
tainer from the wheel.
2. Press the red unlock button.
3. Remove the sealant container from the
compressor.
4. Wrap the empty sealant container in suita‐
ble material to avoid dirtying the cargo
area.
5. Stow the Mobility System back in the vehi‐
cle.
Distributing the sealant
Immediately drive approx. 5 miles/10 km to en‐
sure that the sealant is evenly distributed in the
tire.
Do not exceed a speed of 50 mph/80 km/h.
If possible, do not drive at speeds less than
12 mph/20 km/h.
Seite 275
Wheels and tires Mobility
275
Online Edition for Part no. 0140 2 974 740 - VI/16
Loading ...
Loading ...
Loading ...