Loading ...
Loading ...
Loading ...
5-14
5-14
Frame Servicing
Apply grease to the stem bolt threads and seating
surfaces.
Install the top bridge, washer, and stem nut.
Temporarily install both fork legs.
Apply grease to the top bridge pinch bolt threads and
seating surfaces.
Install and tighten the top bridge pinch bolts to the
specified torque.
Torque: 21 N•m (2.1 kg-m, 15.4 lbf•ft)
Tighten the stem nut to the specified torque.
Torque: 88 N•m (9.0 kg-m, 65 lbf•ft)
Recheck the steering stem adjustment before installing
the removed parts.
(1) TOP BRIDGE
(2) STEM NUT
Turn the steering stem lock-to-lock 5 times to seat the
bearings and retighten the adjusting nut to the specified
torque.
Torque: 5 N•m (0.5 kg-m, 3.6 lbf•ft)
Hand tighten the stem bearing adjusting nut.
(1) ADJUSTING NUT
2
1
1
Loading ...
Loading ...
Loading ...