Loading ...
Loading ...
Loading ...
5-11
5-11
Frame Servicing
Installation
Install the fork leg.
Raise the fork through the bottom bridge and top bridge.
Place the fork tubes in the top clamp. The fork tubes
should be in the first slot aligned with the top of the
clamp.
(1) FORK TUBE
(2) TOP BRIDGE
(1) FORK SPRING
(2) SPRING SEAT
(3) DISTANCE COLLAR
(4) O-RING
(5) FORK BOLT
Install the fork spring, spring seat, and distance collar.
Apply recommended fork fluid to the new O-ring, then
screw the fork bolt into the fork tube.
Pour half the required amount of recommended fork fluid
in the fork leg.
Specified fork fluid:
Showa SS05
Pump the fork tube slowly 8-10 times.
Pour additional fluid to the specified capacity.
Oil level
87 mm (3.9 in)
Oil capacity
405 cc
(13.7 US oz)
(14.3 Imp oz)
FORWARD
2
1
1
2
3
4
5
Loading ...
Loading ...
Loading ...