Hitachi ZAXIS 260F-FE-6N

User Manual - Page 180

For ZAXIS 260F-FE-6N.

PDF File Manual, 383 pages, Download pdf file

Loading ...
Loading ...
Loading ...
Operation—Operating the Machine
TD48962,00001B8 -19-02JUL19-1/1
Lifting the Machine
CAUTION: Prevent possible injury from
unexpected machine movement when lifting
the machine. Check lifting capacity of crane
before lifting the machine. Lift load only
as high as necessary.
Keep all people clear of raised load.
NOTE: The center of gravity (2) will vary depending
on the kind of attachment.
Refer to decals on machine for correct lifting points
(1). There are two lifting points on each side of the
undercarriage.
1. Fully extend arm and bucket (if equipped) cylinders.
2. Position the upperstructure parallel with tracks.
3. Lower boom until attachment comes in contact with
ground.
4. Turn key switch to the OFF position. Remove key
from switch.
5. Pull pilot shutoff lever to locked (UP) position.
6. Close and lock all doors and covers.
3
2
1
TX1229755 —UN—02DEC16
Lifting the Machine (side entry cab shown)
1— Lifting Point (4 used)
2— Center of Gravity
3— Support Bar
7. Route appropriate lifting device through lifting points
and under both sides of the track frame as illustrated.
8. Attach appropriate lifting device to crane.
9. Slowly lift machine. For machine weights, see
Miscellaneous—Specications. (Section 4-6.)
2-3-27
112321
PN=178
Loading ...
Loading ...
Loading ...