Binder CB-S 260 CO₂ incubator with hot air sterilization, series CB – 220-liter capacity

User Manual - Page 17

For CB-S 260.

PDF File Manual, 119 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
CB-S / CB-S-UL (E7) 06/2020 page 17/119
Malfunction and Damage
Continued operation of the chamber during an obvious malfunction or outage of the heating or gas
systems
Contact with live parts during error status
Operation of a unit with damaged power cord
Maintenance
Maintenance work on live parts.
Execution of maintenance work by untrained/insufficiently qualified personnel
Electrical safety analysis during annual maintenance not performed
Trouble-shooting and Repairs
Non-observance of warning messages in the Service Manual
Trouble-shooting of live parts without specified safety measures
Absence of a plausibility check to rule out erroneous inscription of electrical components
Performance of repair work by untrained/insufficiently qualified personnel
Inappropriate repairs which do not meet the quality standard specified by BINDER
Use of replacement parts other than BINDER original replacement parts
Electrical safety analysis not performed after repairs
1.13 Operating instructions
Depending on the application and location of the chamber, it is recommended that the operator of the
chamber provides the relevant information for safe operation of the chamber in a set of operating instruc-
tions.
Keep these operating instructions with the chamber at all times in a place where they are
clearly visible. They must be comprehensible and written in the language of the employees.
Loading ...
Loading ...
Loading ...