Loading ...
Loading ...
Loading ...
●
To prevent stainless steel from rusng due to dirt during
construcon, it is recommended that the protecve lm be
removed aer the installaon is completed. There may be
residual adhesive at the lm cung posion. It is
recommended to use WD-40 protecve liquid to wipe aer
tearing the lm.
●
It is recommended that at least two people collaborate to
install the sleeve. You'd
beer wear gloves throughout the
enre process, handle with care, and pay aenon to
prevenng crushing or pinching injuries.
1. Prepare for the installaon tools, check the components, and
prepare for the
installaon base.
2. Seal the boom of the pedestal with sealing materials to
prevent water accumulaon.
3. Remove the protecve panel on the top of the device, and
determine the barrier direcon and the pedestal installaon
posion according to the default barrier opening direcon
mark.
Figure 3-1 Default Barrier Opening Direcon Mark
Note
Do not immerse the pedestal in the water. In special
circumstances, the immersed height should be no more than
150 mm. The boom circuit board can't be immersed.
4. Use a cross screwdriver to remove screws of the decorave
ring and cable protecon panel, and complete wiring.
4
Loading ...
Loading ...
Loading ...