Loading ...
Loading ...
Loading ...
Cold water connection only
Use the included Y-piece.
Detergent connection at the mixing
compartment of the liquid dispensing
system
Connections 1 and 2 are for paste dispensing. These
connection sockets are closed and must be drilled
open using an 8 mm drill.
Note: Drill only through the first (1) wall, there is an
impact surface (2) 3/8" (10 mm) behind it.
Drilled connections that are no longer in use must be
closed up again.
Connections 3 and 12 are for liquid dispensing.
These connection sockets are closed and must be
cut off to fit the hose diameter using a small saw.
If the opened sockets are no longer in use they must
be closed up
Installation Instructions
36
1"
3/4"
Loading ...
Loading ...
Loading ...