Kolpak P7-0806-CT Walk-In Cooler & Top Mounted Compressor

Walk in installation - Page 5

For P7-0806-CT.

PDF File Manual, 40 pages, Read Online | Download pdf file

P7-0806-CT photo
Loading ...
Loading ...
Loading ...
5
Panel Count And Hardware
Read this manual carefully before beginning the installation and operation of the unit. Scan the QR
Code below to view the Basic Walk-In Installation Service Video.
Using the packing list and skid documentation, count the wall panels, corners, ceilings, doors, and floors
where applicable. Locate and verify the accessory and hardware package(s).
WARNING
Do not attempt to lift the panels or accessories by yourself. Always have adequate lifting equipment or
manpower available to accomplish the task safely.
Do not unwrap the skids and leave the panels in a position that they could fall over or blow over and cause
an injury. Be sure that panels are adequately restrained at all times.
CAUTION
Acids and oils on hands and fingers could discolor wall panel finish. Make sure to wear appropriate gloves
that are free from residue while handling wall and ceiling panels.
CAUTION
Make sure to store the panels as noted below if necessary to ensure that they are not damaged prior to
being installed.
Panel Storage
If the walk-in panels must be stored on a job site before installation, store them inside if possible.
The PVC protective panel covering should only be removed after final assembly of the walk-in. Gloves should be worn to
prevent acids and oils on hands/fingers from creating smudges on panel surface.
The panels may be stored on skids as received, provided the skids are on level surface and kept free of moisture.
Loading ...
Loading ...
Loading ...