Kolpak P7-0806-CT Walk-In Cooler & Top Mounted Compressor

Walk in installation - Page 30

For P7-0806-CT.

PDF File Manual, 40 pages, Read Online | Download pdf file

P7-0806-CT photo
Loading ...
Loading ...
Loading ...
30
If tapered roof system is used, the screw length will vary. Install the short screws at the low side and increasingly longer
screws toward the high side. Extra care should be taken to only penetrate the top metal skin of the walk in top panel. Do not
penetrate the interior metal skin.
To prevent “Tab Rollover”, temporarily secure the edge of the overhanging roof membrane to the top edge of the wall before
continuing to the second tab
Unroll roof cap membrane to next tab and repeat the screw and fastening plate pattern. Always pull slack out of membrane
before starting a row of fasteners. Use of GRiPull roof puller racket vice grip tool is ideal to keep material taut.
After all fastening tabs have been secured, fold corners as shown. A Pull-Tite hand/knee puller vice grip tool can be used to
pull membrane taut around perimeter and then install roof cap termination bar and trim. Use 1-1/2” stainless steel screws
spaced 6” on center. Seal top edge of termination bar.
Loading ...
Loading ...
Loading ...