Kolpak P7-0806-CT Walk-In Cooler & Top Mounted Compressor

Walk in installation - Page 34

For P7-0806-CT.

PDF File Manual, 40 pages, Read Online | Download pdf file

P7-0806-CT photo
Loading ...
Loading ...
Loading ...
34
Cooler Piping
Inspection Feature
Data
Accept
Reject
Action Required
Suction Lines Insulated:
Oil Trap at Base of Suction Riser:
Copper Drain Lines Sloped Min 1/2”
ft:
Copper Drain Lines Insulated:
Copper Piping Supported Every 5’:
Copper Drain Line Trapped Outside
Cooler Space:
Walk-In Freezer
Inspection Feature
Data
Accept
Reject
Action Required
Serial Number:
Interior Lights Installed and
Working:
All Penetrations Sealed:
Doors/Jambs Squared and
Operating Properly:
All Panel Locks Fully Engaged:
All Plug Buttons Installed:
Door Heater Working:
Door Sweeps Adjusted:
Heat Air Vent Working:
Door Closers Adjusted and
Working:
Wainscot and Trim Installed:
Alarm Set and Working:
Thermometer Bulb Mounted
and Calibrated:
Walk-In Clean (no excessive
caulk, etc.)
Walk-in at proper temperature:
Walk-In Cooler
Inspection Feature
Data
Accept
Reject
Action Required
Serial Number:
Interior Lights Installed and
Working:
All Penetration Sealed:
Doors/Jambs Squared and
Operating Properly:
All Panel Locks Fully Engaged:
All Plug Buttons Installed:
Door Heater Working:
Door Sweeps Adjusted:
Heat Air Vent Working:
Door Closers Adjusted and
Working:
Wainscot and Trim Installed:
Alarm Set and Working:
Thermometer Bulb Mounted and
Calibrated:
Walk-In Clean (no excessive caulk,
etc.)
Walk-in at proper temperature:
Loading ...
Loading ...
Loading ...