Loading ...
Loading ...
Loading ...
5-5
POWR
E
ENGINE UNIT
SERVICE POINTS
Shim removal
1. Remove:
● Shims
NOTE:
To ease reassembly and coupling align-
ment, remove the shims and organize them
in their respective groups (e.g., front right,
rear left) prior to removing the mounting
bolts.
Engine mount inspection
1. Inspect:
● Engine mounts
Cracks/damage → Replace.
Coupling clearance inspection
1. Measure:
● Clearance a
● Clearance b
(with the rubber damper)
Out of specification → Adjust.
NOTE:
Measure the clearances with a straightedge
and thickness gauge.
Clearance a:
0–0.5 mm (0–0.020 in)
Clearance b:
2–4 mm (0.079–0.157 in)
2. Adjust:
● Clearance a and b
Adjustment steps:
● Adjust the clearance a by adding or
removing shims.
● Adjust the clearance b by moving the
engine unit position.
Loading ...
Loading ...
Loading ...