Gevi GECME020DE-U Espresso Machine & Coffee Maker

Quick Use Manual - Page 16

For GECME020DE-U.

PDF File Manual, 72 pages, Read Online | Download pdf file

GECME020DE-U photo
Loading ...
Loading ...
Loading ...
1211
- Lightly pushing down, turn the Bean
Hopper in a clockwise direction to
lock the Hopper into place.
- This opens the Hopper Gates ( to
release coffee beans onto the Burrs).
At Grind Setting 30, Hopper Gates are
fully open.
- Continue to turn the Bean Hopper
in a clockwise direction to set the
Grind Setting.
- As a starting point for espresso
extraction try Grind Setting 10.
- Fill the Bean Hopper with freshly
roasted coffee beans.
- Long press Brew button to start. The
machine will have a beep & water
should start flowing from the Group
Head.
- After it flows out 150mL-200mL of
water to flush the machine, press
the Brew button to stop.
- Press the Power button to exit
function.The machine will return to
the READY state.
- Pour away the water in the cup.
- Position Steam Wand over the Drip
Tray.
- Turn DIAL to HOT WATER.
- Allow water to run through for 20 sec.
- Return DIAL to vertical position.
- The machine will return to the
READY state.
- Now the Espresso Machine should
be thoroughly primed.
- Wash Portafilter & Filter Basket
in warm water & dry before making
your first coffee.
This priming step must be compl-
eted prior to first use.
IMPORTANT
Make sure that the Water Reserv-
oir is clean & free of any debris, as
any fine particles can block the
water flow.
NOTE
Turning the Portafilter to the
centre position might be tight for
the first few uses.
NOTE
For the first few seconds the Pump
will make a louder than usual noise
as it begins pumping the water
through.
NOTE
Step 6. Preparing to Prime Machine
Fill Water Reservoir
- Remove the orange silicone cap on
the Water Reservoir valve.
- Open the Lid and lift upwards using
the Handle inside.
- Fill with cold water from the tap.
- Insert the Water Reservoir into
position & close the Lid.
Power
- Ensure that the Steam & Hot Water
DIAL is in the vertical position.
- Insert the Power Plug into a 120V AC
power outlet & switch the power on.
- Press the POWER BUTTON to turn
on the machine.
- The POWER LIGHT will illuminate &
pulse to indicate the Thermoblock
is heating up.
- The Grind Button Light will be fully
illuminated from turn on.
- When the POWER, Brew button Light
& STEAM/HOT WATER Light are all
fully illuminated, the machine is in
the READY state for all features.
Insert Portafilter
- Insert the Long Brew Filter Basket in
the Portafilter.
- Align the Portafilter with the
'INSERT' position located on the left
of the Group Head.
- Insert the Portafilter flat against
the Group Head, then turn the
Portafilter right all the way to the
centre Cposition.
MAX 2.8L
READY
Step 7. Prime Espresso Machine
- Press Brew button three times. The
machine is in making manual-shot
mode status.
4. Before First Use4. Before First Use
Loading ...
Loading ...
Loading ...