Part number 550-100-211/0122
– 6 –

y Local, state, provincial, and national codes, laws, regulations
and ordinances.
y National Fuel Gas Code, ANSI Z223.1/NFPA 54 - latest
edition.
y National Electrical Code.
y For Canada only: CAN/CSA B149.1, Natural Gas and Pro-
pane Installation Code, and any local codes.
e Evergreen
®
boiler gas manifold and controls
met safe lighting and other performance criteria
when boiler underwent tests specied in ANSI
Z21.13 — latest edition.

1. e boiler must not be installed on carpeting.
Do not install boiler on carpeting even if founda-
tion is used. Fire can result, causing severe personal
injury, death or substantial property damage.

2. e boiler is suitable for INDOOR installation only.
3. Check for nearby connection to:
y System water piping
y Venting connections
y Gas supply piping
y Electrical power
y Condensate drain
4. Check area around boiler. Remove any combustible materials,
gasoline and other ammable liquids.
Failure to keep boiler area clear and free of com-
bustible materials, gasoline and other ammable
liquids and vapors can result in severe personal
injury, death or substantial property damage.
5. e boiler must be installed such that the gas ignition system
components are protected from water (dripping, spraying,
rain, etc.) during appliance operation and service (circulator
replacement, condensate trap, control replacement, etc.).
6. If new boiler will replace existing boiler, check for and correct
system problems, such as:
y Sediment or corrosion in system piping — clean and ush
piping BEFORE connecting the new boiler. See page86.
y System leaks causing oxygen corrosion or heat exchanger
cracks from hard water deposits.
y Incorrectly-sized expansion tank.
y Lack of freeze protection in boiler water causing system
and boiler to freeze and leak.

Precautions
1. Take the following special precautions when installing the
boiler in a residential garage. If the boiler is located in a
residential garage:
y Mount the boiler with its bottom at least 18inches above
the oor. is complies with the National Fuel Gas Code,
ANSI Z223.1 NFPA 54 -latest edition for U. S. installa-
tions, or
Natural Gas and Propane Installation Code,
CAN/CSA
B149.1 and B149.2 for Canadian installations.
y Locate or protect the boiler so it cannot be damaged by
a moving vehicle.
y Ensure that the installation complies with all applicable
codes.
y Prevent boiler water and condensate from freezing.

Evergreen
®
boileraloneinboilerroom
(DirectVent)
1. No air ventilation openings into boiler room are needed if
clearances around Evergreen
®
boiler are at least equal to the
SERVICE clearances shown in Figure1,page7.
2. For spaces that DO NOT supply the minimum service clear-
ances, provide two openings as shown in Figure1,page7.
Each opening must provide 1square inch free area per 1,000
Btuh of boiler input.
Evergreen
®
boilerinsamespacewithothergas
oroil-redappliances
1. Follow the sizing requirements shown in Figure26,page24.
e space must be provided with combustion/
ventilation air openings correctly sized for all
appliances located in the same space as the
Evergreen
®
boiler.
Reinstall boiler jacket front door aer servic-
ing. e boiler front door must be securely
fastened to the boiler to prevent boiler from
drawing air from inside the boiler room. is
is particularly important if the boiler is located
in the same room as other appliances.
Failure to comply with the above warnings
could result in severe personal injury, death
or substantial property damage.

1. e Evergreen
®
boiler requires a special vent system, designed
for pressurized venting. Evergreen
®
boilers are rated ANSI
Z21.13 Category IV (pressurized vent, likely to condense in
the vent). See instructions beginning on page19.
2. You must also install air piping from outside to the boiler
air intake adapter. e resultant installation is categorized as
direct vent (sealed combustion). Note prevention of combus-
tion air contamination on page19 when considering vent/
air termination.
3. Vent and air must terminate near one another unless oth-
erwise specied in this manual. Vent and air piping may be
routed vertically through the roof or out a side wall, following
the options give in this manual. You may use any of the vent/
air piping methods covered in this manual. Do not attempt
to install the boiler using any other means.
4. Be sure to locate the boiler such that the vent and air piping
can be routed through the building and properly terminated.
e vent/air piping lengths, routing and termination method
must all comply with the methods and limits in instructions
beginning on page19.