User Manual - Page 115

For AR210 2017 LBT1050A.

Loading ...
Loading ...
Loading ...
Equipment operation
107
Collapsing and setting up the
wakeboard tower
(212X / 212 Limited S)
When storing the boat, collapse the wake-
board tower.
NOTICE
Accidentally dropping the upper tower
section while collapsing or raising it can
damage the tower, the boat, or both. An
assistant needs to support the upper
tower section during the procedure.
Do not operate the boat or transport it on
the trailer with the tower in the collapsed
position to avoid possible damage.
To collapse the wakeboard tower:
(1) While an assistant supports the wake-
board tower, remove the T-handle lock
pin on both sides of the wakeboard tower
by turning it 180° and pulling it out.
1 Wakeboard tower
2 T-handle lock pin
(2) Lower the wakeboard tower until it stops.
To set up the wakeboard tower:
(1) Lift the wakeboard tower.
(2) While an assistant supports the wake-
board tower, insert the T-handle lock pins
into the tower with the white mark on
each pin facing up.
(3) Turn each T-handle lock pin 180° so that
the white mark on the pin is aligned with
the “LOCK” arrow mark.
1 White mark
2 Arrow mark
2
1
2
1
SportsBoat_F3R10.book Page 107 Monday, June 27, 2016 3:22 PM
Loading ...
Loading ...
Loading ...