User Manual - Page 263

For 2021 HARDTOP 2 DOOR.

Loading ...
Loading ...
Loading ...
Filling
1. Shake the sealant container.
2. Pull filling hose completely out of the
cover of the sealant container. Do not
kink the hose.
3. Slide the sealant container into the
holder on the compressor housing, en-
suring that it engages audibly.
4. Screw the filling hose of the sealant con-
tainer onto the tire valve of the non-
working wheel.
5. With the compressor switched off, in-
sert the plug into the power socket in-
side the vehicle.
6. With the ignition switched on or the en-
gine running, switch on the compressor.
Let the compressor run for max. 10 minutes
to fill the tire with sealant and achieve a
tire inflation pressure of approx. 2.5 bar.
While the tire is being filled with sealant,
the tire inflation pressure may sporadically
reach approx. 5 bar. Do not switch off the
compressor at this point.
Seite 263
Wheels and tires MOBILITY
263
Online Edition for Part no. 01405A1E4E3 - II/20
Loading ...
Loading ...
Loading ...