FLUKE N4K 3PP52IB Norma 4000 3-Phase Power Analyzer with 3 x PP52 Modules with Binding Posts & IEEE488/LAN

User Manual for the Fluke N4K 3PP52IB Norma 4000 3-Phase Power Analyzer with 3 x PP52 Modules with Binding Posts & IEEE488/LAN - Page 82

For N4K 3PP52IB.

PDF File Manual, 161 pages, Read Online | Download pdf file

N4K 3PP52IB photo
Loading ...
Loading ...
Loading ...
NORMA 4000/5000
Operators Manual
7-22
Menu Integration Setup, second field column State is highlighted.
1. Press Enter, select AUTO and confirm with Enter.
Clear values at start is now enabled. If you want to change it, select MAN and
confirm with Enter.
2. Save the configuration settings by pressing the SAVE function key.
Note
In the factory configuration 1:W3 the function clear manual (MAN) is
preselected.
Configure Start
You can select different start conditions:
Column Settings Description
Trig
Remote
time
key
Start via Interface command
Start on date and time
Start when key pressed (Key F1)
at -Date- Start time(only active at Trig time)
after - No function
Menu Integration Setup, first field column Trig is highlighted.
1. Press Enter, select start condition and confirm with Enter.
2. Start condition is now set. If you have selected a time to start (time) enter the
time in the column at. Proceed as described below:
Menu Integration Setup, first field column at is highlighted.
1. Press Enter, select year, month, day, hour minute and seconds with the cursors
and confirm with Enter.
Start time is now set.
2. Save the configuration settings by pressing the SAVE function key..
Note
Date and time for start is taken from the clock in the unit. Correct the date
and time of the unit before you start the integration calculation (chapter 7
“Adjust Date and Time”).
1.888.610.7664 sales@GlobalTestSupply.com
Fluke-Direct.com
Loading ...
Loading ...
Loading ...