Loading ...
Loading ...
Loading ...
Installation
*INSTALLATION*
90
Surface-mounted installation
Create the worktop cut-out. Remem-
ber to maintain the minimum safety
distances (see “Installation – Safety
distances”).
Cut the top of the drilling template to
the thickness of your worktop. Place
it on the cabinet rear wall with side2
facing up. Use the drilling template to
create a cut-out for the air duct or the
Plug&Play adapter.
If you do not have a drilling template,
see “Installation – Rear wall cut-out –
without drilling template”.
Seal any cut surfaces on wooden
worktops with a special varnish, sil-
icone sealant or resin to prevent the
wood from swelling as a result of
moisture ingress. The sealant must
be heat-resistant.
Make sure that the sealant does not
come into contact with the top of the
worktop.
Stick the sealing strip supplied under
the edge of the hob. Do not apply the
sealing strip under tension.
The Plug&Play adapter may break
off.
When placing the hob on the work-
top, make sure that it is not placed
on top of the Plug&Play adapter.
Feed the mains connection cable for
the hob down through the worktop
cut-out.
Plug&Play mode: remove the protect-
ive foil from the adhesive tape at the
end of the Plug&Play adapter.
Place the hob centrally in the cut-out.
When doing this, make sure that the
seal of the appliance sits flush with
the worktop on all sides. This is im-
portant to ensure an effective seal all
round.
Do not use any additional sealant
(e.g. silicone) on the hob.
If the seal does not sit flush with the
worktop in the corners, the corner ra-
dius (≤R4) can be carefully cut to fit
using a jigsaw.
Plug&Play mode: align the Plug&Play
adapter with the predrilled hole. Press
the adapter onto the rear wall until it
sticks in place.
Connect the hob to the power supply.
Check that the hob works.
Loading ...
Loading ...
Loading ...