3. Installation and Wiring
Multiple Battery Pack Connections
CAUTION!
Ensurecorrectpolarityofthebatterystringseriesconnection.DONOTmixbatterieswithdierent
capacityordierentbrands,orneworoldbatteries.
WARNING!
Ensure correct polarity of string end connections to the battery circuit breaker, and from the
battery circuit breaker to the UPS terminals (i.e., (+) to (+) / (-) to (-) / (N) TO (N)). Disconnect one or
more battery cell links in each tier. Do not reconnect these links and do not close the battery circuit
breaker unless all connections are properly checked and approved.
3.15.1 Installation and Setup
Figure 3-19: 10kVA, 15 kVA and 20kVA Battery Connection
Note: Before installation, inspect the unit. Any damage to packing should be noted at the time of receipt with the delivery carrier. Ensure
nothing inside the package is damaged. Retain the original packing material in a safe place for future use.
Remove the rail kit, battery enclosure and battery modules from the packaging.
Note: The battery modules are very heavy. Be cautious when unpacking and lifting the unit to avoid injury.
Note: Refer to section 4.3.6.2, Step 4 for information on conguring the battery Ah capacity, the number of batteries and the
number of battery cabinets.