Allowablevent/airpipematerials&lengths
Use only the vent materials and kits listed in
Figure24,page21. Provide pipe adapters if
specied.
1. Locate the terminations such that the total air pip-
ing and vent piping from the boiler to the termina-
tion will not exceed the maximum length given in
Figure23,page20.
For polypropylene applications, comply with
any additional requirements in the vent system
manufacturers instructions. Provide 4” PVC-
to-PP transition pieces at the boiler vent and
air connections. PP adapter must have smooth,
straight section of pipe to insert in to the boiler
vent and air connections and must t and seal
tightly. PP adapters with their own seal which
would interfere with the internal seal of the
boiler vent or air connections must not be
used. Refer to page117 for a list of compliant
adapters. Install a locking collar at every joint.
For AL29-4C vent pipe applications, comply
with any additional requirements in the vent
system manufacturers instructions. Provide a
4”PVC transition piece at the boiler vent con-
nection. e air piping must be PVC or CPVC.
2. For 4” to 3” transitions, must use appropriate vent
material. For polypropylene or stainless steel must use
approved suppliers transitions (EVG 220 only).
Determineterminationlocation
1. Wall penetration thickness between 0” to 24”.
2. e air and vent terminations must be installed as shown
in Figure37.
3. The terminations must comply with clearances and
limitations shown in Figure25,page23.
4. Locate the terminations so they are not likely to be dam-
aged by foreign objects, such as stones or balls, or subject
to buildup of leaves or sediment.
Multiplevent/airterminations(Figure38,page32)
1. When terminating multiple Evergreen
®
boilers, terminate
each vent/air connection as described in this section.
Terminate all vent pipes at the same height
and all air pipes at the same height to avoid
possibility of severe personal injury, death or
substantial property damage.
2. Place roof penetrations to obtain minimum clearance of
12inches between edge of air intake elbow and adjacent
vent pipe of another boiler for U. S. installations (see
Figure38,page32). For Canadian installations, provide
clearances required by
Natural Gas and Propane Instal-
lation Code, CAN/CSA
B149.1 or B149.2 Installation
Code and a ULCS636 compliant vent kit.
3. e air inlet of a Evergreen
®
boiler is part of a direct vent
connection. It is not classied as a forced air intake with
regard to spacing from adjacent boiler vents.
Figure37 Separate pipes vertical termination
Terminateventandairpipessuchthat:
a AIRINTAKEIS AT LEAST 12 inches below vent outlet.
b AIRINTAKEIS AT LEAST 12 inches above roof or snow line,
Keep vents/air intake area clear of accumulating snow.
c Ventandairterminationsarettedwithbirdscreens.
Step1 Read and follow all instructions in this manual. DO NOT
proceedwithvent/airinstallationuntilyouhaveread
page19throughpage24.
See notices
at le.
Step2 Install the boiler in a location that allows proper routing of all
vent and air piping to the selected location.
Step3 Make sure the selected vertical termination location complies
with Figure25,page23. (Multiple boiler terminations must also
comply with Figure38,page32.)
Step4 Use only the vent materials listed in Figure24,page21. Provide
pipe adapters where required. Vent piping and air piping lengths
must not exceed the values shown in Figure23,page20.
Step5 Prepare the vertical penetrations and secure penetration com-
ponents as instructed in this section. See “Prepare roof penetra-
tions” and “Termination and ttings” on page32.
Step6 e air piping must terminate in a 180-degree return bend or
down-turnedelbow as shown above. e vent piping must
terminate in a couplingpointedupward as shown above.
Step7 Install vent and air piping between the boiler and the vertical
terminations. Slope horizontal piping downward toward the
boiler at least 1/4 inch per foot. Install pipe supports every 5 feet
on both the horizontal and vertical runs. Install a hanger sup-
port within 6inches of any upturn in the piping. See page38 for
general guidelines. Also comply with vent pipe manufacturer’s
instructions.
See notices at le.
Step8 Insert the vent and air piping through the vertical penetrations
and secure the termination ttings.
Step9 Maintain clearances shown above. Vent and air terminations
must be tted with a bird screen as shown.
USESWEEPELBOWSFORALLVENTAND
AIRPIPING — DO NOT use short radius elbows
for vent or air piping. Boiler performance could be
aected.
Part number 550-100-211/0122
– 31 –
220 /29 9/3 00 /39 9 

Loading ...
Loading ...
Loading ...