Binder LIT MK 240 dynamic climate chambers

User Manual - Page 65

For LIT MK 240. Also, The document are for others Binder models: LIT MK 720

PDF File Manual, 173 pages, Read Online | Download pdf file

LIT MK 240 photo
Loading ...
Loading ...
Loading ...
MK LIT (E5) 01/2021 page 65/172
10.8 Performance when opening the door
The fan turns off immediately after opening the door.
After 60 seconds from opening the door, heating, and refrigeration turn off. The compressor continues
operating during 5 minutes without cooling function.
After closing the door, heating, refrigeration, and fan turn on again.
11. Commissioning
To ensure the effectiveness of all safety devices, commissioning should be carried out by BINDER
Service.
Ensure that commissioning is carried out by trained personnel with the necessary expertise. (see chap. 1.1)
Ensure that the test is carried out and passed before initial commissioning (chap. 6.2.1).
Installation of the chamber has been carried out in accordance with the information in chap. 9.
All connections on the chamber have been established and the chamber is ready for commissioning.
11.1 Preparing and activating the general safety devices
11.1.1 Inserting the CO
2
pressurized gas cylinder
Ensure that the CO
2
pressurized gas cylinder of the fire suppression device is sufficiently filled.
Observe the safety instructions when handling CO
2
gas (chap. 1.7.3) and gas cylinders
(chap. 1.7.5).
Mount the solenoid coil onto the valve
State of delivery Valve with mounted solenoid coil
Loading ...
Loading ...
Loading ...