Troy-Bilt 31AH7FP4B66 Storm Tracker™ 2890 Snow Blower

OPERATOR’S MANUAL - Page 12

For 31AH7FP4B66.

PDF File Manual, 88 pages, Read Online | Download pdf file

31AH7FP4B66 photo
Loading ...
Loading ...
Loading ...
12
ASSEMBLY
Overhead Chute Rotation Control w/ 4-Way
Electric Pitch & Rotation Control
Chute Control Rod
or
Manual Chute
Control Rod
Chute Assembly
Figure 28
NOTE: If equipped with a metal chute
assembly - This assembly will install the
same the standard chute shown in the
figures of this procedure.
1. Remove hairpin clip (a), wing nut (b) and hex screw (c) from
chute control head. Remove clevis pin (d) and bow-tie cotter
pin (e) from chute support bracket (Figure 29).
Chute
Chute Support Bracket
Chute Base
Chute Control Head
d
a
c
1 1
2
e
b
Figure 29
NOTE: For smoothest operation, cables should all be to the left of
the chute control rod.
2. Insert round end of chute control rod into chute control head.
Push rod as far into chute control head as possible, keeping
holes in rod pointing upward (Figure 30).
Figure 30
3. Place chute onto chute base and ensure chute control rod is
positioned above lower handle. Secure chute control head to
chute support bracket with clevis pin (d) and bow-tie cotter
pin (e) removed in Step 1 (Figure 31).
d
e
Figure 31
4. Finish securing chute control head by installing hex screw (c)
and wing nut (b) removed in Step 1 (Figure 32).
c
b
Figure 32
5. Insert other end of chute control rod into coupler below
handle panel. Make sure to line up flat end of rod and flat end
of coupler. You may need to rotate rod around until these two
surfaces line up (Figure 33 inset).
Figure 33
Loading ...
Loading ...
Loading ...