Dahua IPMECD-105X Barrier Straight arm /Telescopic arm/Folding arm/Fence arm

Boom Gate User's Manual V1.0.0 - Page 14

For IPMECD-105X.

PDF File Manual, 40 pages, Read Online | Download pdf file

IPMECD-105X photo
Loading ...
Loading ...
Loading ...
User’s Manual
8
3 Product Installation
Concrete Base Requirements 3.1
This section introduces the requirements for selecting and constructing the concrete base. For
details, see the corresponding construction guide.
A concrete base is required for installing the boom gate.
Pour concrete mixer into the location demarked for the base, to construct a concrete base that is
between 150250 mm above the ground. Heights that do not fall within this range might influence
the accuracy of radar detection.
Installing the Casing 3.2
Place the casing in the set position. Open the door of the casing, use a screwdriver to draw Step 1
lines on the ground along the groove of the base plate, and then move the casing away.
Mark 4 expansion bolt holes according to the dimensions as shown in the following figure. Step 2
Casing dimensions (mm [inch]) Figure 3-1
Drill holes for the expansion bolts and screw the expansion bolts into the holes. Adjust the Step 3
horizontal and vertical angles of the casing, and then tighten the nuts.
Loading ...
Loading ...
Loading ...