Perlick RSNDK

User Manual - Page 21

For RSNDK.

PDF File Manual, 28 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
Perlick is committed to continuous improvement. Therefore, we reserve the right to change specications without prior notice
21
Form No. Z2751
Rev. 05.26.21
PERLICK NITRO BEVERAGE DISPENSING KIT
Operation/Installation Manual
1. Ensure there are two nitrogen lines connected to the
inputs of the nitrogen infuser and an air distributor.
2. Make sure two beverage tubes are connected to the input
of the nitrogen infuser (Beverage A & B) and are attached
to a black quick disconnect.
3. Check that there are two gray quick disconnects attached
to two dierent lines on the air distributor.
4. See if quick disconnects are in properly installed on the
tank according to Operation 7.
5. Check the connections between the barbed tee tting, air
distributors, and regulator (Fig. 21).
6. Ensure the regulator is tightly axed to the tank.
7. Tug each and beverage tube installed in this operation to
ensure a secure connection is made.
a) If the line makes any indication that its slipping out
of the worm drive clamp, uninstall the clamp and redo
this connection.
8. Before opening regulator and setting pressure, ll kegs
with desired beverage.
9. Set the regulator to 28 PSI.
10. Wait 1-2 minutes for the system to pressurize.
11. The system is ready to dispense.
LINE SETUP CHECK DUAL INFUSER
(
FOR POST
-
INSTALLATION & CLEANING
)
All Components shown are reference only
Fig. 21
(Line Setup Check for Dual Infuser)
Loading ...
Loading ...
Loading ...