Majestic 500DVMNSC Direct Vent Natural Gas Fireplace

User Manual - Page 23

For 500DVMNSC.

PDF File Manual, 68 pages, Read Online | Download pdf file

500DVMNSC photo
Loading ...
Loading ...
Loading ...
23
75D2525
DVM Series Direct Vent Gas Fireplace



1. Determine the route your vertical venting will take. If
ceiling joist, roof rafters or other framing will obstruct
the venting system, consider an offset. Refer to
Figure 32 to avoid cutting load bearing members.
 Pay special attention to these installation instructions
for required clearances (air space) to combustibles when
passing through ceilings, walls, roofs, enclosures, attic
rafters, etc. Do not pack air spaces with insulation. Also
note maximum vertical rise of the venting system and any
maximum horizontal offset limitations. Offsets must fall
within the parameters shown on Page 13, Figure 15.
2. Set replace in desired location. Drop a line plumb down
from the ceiling to the position of the ue exit. Mark the
center point where the vent will penetrate the ceiling.
Drill a small locating hole a this point.
Drop a plumb line from the inside of the roof to the ceiling
locating hole in the ceiling. Mark the center point where
the vent will penetrate the roof. Drill a small locating hole
at this point.
1
2
3
4
1
2
3
4
Example: Elbow 1 = 90°
Elbow 2 = 45°
Elbow 3 = 45°
Elbow 4 = 90°
Total Angular = 270°
Variation
FP1179
Figure 31 -
Maximum Elbow Usage
Figure 32 -
Offset with Wall Strap and 45° Elbows
Roof Flashing
Wall Strap
45° Elbows
Ceiling Firstop
FP1669

1. Cut a 10Z\x" (267 mm) square hole in the ceiling using
the locating hole as a center point The opening should
be framed to 10Z\x" x 10Z\x" (267 x 267 mm) inside dimen-
sions as shown in Figure 34 using framing lumber the
same size as the ceiling joist. If the area above the
ceiling is an insulated ceiling or a room, nail restop
from the top side. This prevents loose insulation from
falling into the required clearance space. Figure 33.
Otherwise, install restop below the framed hole. The
restop should be installed with no less than three nails
per side. Figure 34
2. Assemble the desired lengths of pipe and elbows nec-
essary to reach from the burner system ue up through
the restop. Be sure pipe and elbow connections are
fully twist-locked. Page 16, Figure 15
3. Cut a hole in the roof using the locating hole as a center
point. (Cover any exposed open vent pipes before
cutting hole in roof). The 10Z\x" x 10Z\x" (267 x 267mm)
hole must be measured on the horizontal. Actual length
may be larger depending on the pitch of the roof. There
must be a 1" minimum clearance from the vent pipe to
combustible materials. (Insulation should be considered
a combustible material) Frame the opening as shown
on Page 16, Figure 16.
4. Connect a section of pipe and extend up through the
hole.
Loading ...
Loading ...
Loading ...