La Marzocco GS3

User Manual - Page 18

For GS3.

PDF File Manual, 62 pages, Read Online | Download pdf file

GS3 photo
Loading ...
Loading ...
Loading ...
EN
18
8. Mandatory Maintenance and Check-up Operations
These operations are in addition to the Maintenance and Periodic Cleaning Operations as specied in Chapter 7.
The following maintenance and check-up operations sould be carried out by a qualied technician.
The time required for the periodic maintenance is determinated by the quantity of daily work and/or coffee consumption.
N.B. These periodic maintenance operations are not covered by warranty.
EVERY THREE/FOUR MONTHS
EVERY SIX/EIGHT MONTHS (in addition to the above)
EVERY YEAR (in addition to the above)
Replace group gaskets
Replace diffuser screens
Clean auto-fill probe
Check vacuum breaker for
proper operation
Inspect water inlet valve
Inspect drain system for leaks
or clogs
Check flow rate for each group
Check brew temperature
Check that brew pressure is
at 9bar
Check all switches for proper
operation
Check/note water hardness
(Water quality must be within
the range of parameters
specified in the chapter
on Installation, otherwise
warranty is voided)
Check filter basket condition
If AV Model:
Check shot volumes
Test flowmeters ohm value
(ohm value is acceptable if
greater than 1.8 K ohm, and
less than 2.2 K ohm
Rebuild steam assemblies
Check the condition of the inside of boilers and if necessary rinse out with a proper cleaning product allowed for food and beverage
appliances.
EVERY 3 YEARS (in addition to the above)
Replace portafilter baskets
Inspect group valve plungers
Inspect vacuum breaker
Inspect steam boiler
pressurestat
Inspect expansion valve
Inspect electrical wiring
condition
Inspect boilers safety switches
Replace over-pressure valve
(safety valve)
Accurate control of the
tightness at 2,4Nm of
each cable on the terminal
block.
If MP Model:
Disassembly and lubrication
of the components of the MP
valve
Loading ...
Loading ...
Loading ...