Loading ...
Loading ...
Loading ...
7
XBU55 PRE ASSEMBLY
UNPACKING
1. Cut the straps, then along the dotted line on the bottom of the box; lift
the box over the unit and unpack.
2. Locate the hardware package. The hardware is separated into four steps.
Remove the tools rst. Remove the hardware for each step as needed to
avoid confusion. The numbers in the instructions that are in parenthesis
(#) are the item number from the assembly drawing for reference.
TOOLS INCLUDED:
13/15mm Wrench
12/14mm Wrench
Phillips Screwdriver
PARTS INCLUDED:
1 Main Frame
1 Console Mast
1 Rear Stabilizer
1 Seat
1 Front Handle Bar
1 Handle Bar
1 Console Mast Cover
1 Front Stabilizer Cover
1 Rear Stabilizer Cover
1 Console
1 Seat Cushion
1 Water Bottle Holder
2 Pedals
1 Hardware Kit
Loading ...
Loading ...
Loading ...